VIABILITY GAP FUNDING SCHEME FOR GRID-SCALE ENERGY STORAGE

05 Nov 2026

Tags: Prelims   Current events of national and international importance

Source: The Indian Express

Context: Union Cabinet approved a ₹17,500 crore Viability Gap Funding (VGF) scheme to promote grid-scale energy storage systems during 2026–27 to 2030–31, supporting renewable energy integration and grid stability.

Key Features

  • Target Capacity: 92 Gigawatt-hours (GWh).
    • Battery Energy Storage Systems (BESS): 30 GWh.
    • Pumped Hydro Storage (PHS): 60 GWh.
    • Emerging storage technologies: 2 GWh.
  • Total Investment: Approximately ₹97,600 crore, including ₹14,500 crore VGF support.
  • Allocation: Through tariff-based competitive bidding.
  • Eligible Entities: Public and private sector electricity distribution companies for BESS and PHS; public and private entities for alternative storage technologies.
  • Domestic Content Requirement (DCR): Minimum 40% for BESS projects.

Energy Storage Technologies

  • Battery Energy Storage Systems (BESS):
    • Store electricity chemically and release it when required.
    • Lithium-ion batteries, particularly Lithium Iron Phosphate (LFP) batteries, dominate grid-scale storage.
  • Pumped Hydro Storage (PHS):
    • Surplus electricity pumps water from a lower to an upper reservoir.
    • During peak demand, water flows downhill through turbines to generate electricity.

Significance

  • Stores surplus solar and wind energy and supplies electricity when generation is low or demand peaks.
  • Improves grid stability and reliability.
  • Reduces renewable energy wastage and supports India's clean energy transition.

Prelims Pointers

  • VGF: Government financial assistance to make economically desirable but financially unviable infrastructure projects commercially viable.
  • Energy Storage Target: India aims for 411 GWh storage capacity by 2031–32.
  • Grid-scale Storage: Enables balancing of intermittent renewable energy supply with electricity demand.

Prelims Question

Q1. With reference to the Viability Gap Funding (VGF) Scheme for grid-scale energy storage, consider the following statements:

  1. The scheme aims to support a total energy storage capacity of 92 GWh.
  2. Pumped Hydro Storage accounts for the largest share of the targeted capacity.
  3. VGF is financial assistance provided by the Government to make economically desirable but financially unviable infrastructure projects commercially viable.
  4. The scheme mandates a minimum domestic content requirement of 40% for both Battery Energy Storage Systems and Pumped Hydro Storage projects.

Which of the statements given above are correct?

(a) Only one
(b) Only two
(c) Only three
(d) All four

Answer: (c) 

Explanation:

  • Statement 1 is Correct: The target is 92 GWh.
  • Statement 2 is Correct: Pumped Hydro Storage has a target of 60 GWh, compared with 30 GWh for BESS and 2 GWh for emerging technologies.
  • Statement 3 is Correct: This is the purpose of VGF.
  • Statement 4 is Incorrect: The 40% Domestic Content Requirement specified in the article applies to BESS projects, not PHS projects.